PTIR (PTIR) μ£Όκ° λ° μ’ λͺ© μ 보
PTIR μ€μκ° μ£Όκ°
| νλͺ© | κ° |
|---|---|
| νμ¬κ° | 26.93 λ¬λ¬ |
| λ³λλ | βΌ 0.91 λ¬λ¬ |
| λ³λλ₯ | -3.27% |
| κ±°λλ | 3,632,778 |
| κ±°λλκΈ | 97,862,316.709 λ¬λ¬ |
PTIR μΌλ³ μ£Όκ°
| λ μ§ | μκ° | κ³ κ° | μ κ° | μ’ κ° | κ±°λλ | κ±°λλκΈ |
|---|---|---|---|---|---|---|
| 11/4/2025 | 34.68 | 36.13 | 32.265 | 34.18 | 9,220,836 | 316,006,348.47 |
| 11/5/2025 | 33.51 | 34 | 30.85 | 33.17 | 6,630,587 | 215,003,414.06 |
| 11/6/2025 | 33.18 | 34.25 | 28.46 | 28.65 | 8,238,590 | 251,962,445.69 |
| 11/7/2025 | 27.99 | 29.79 | 26.59 | 29.58 | 7,062,115 | 198,357,861.27 |
| 11/10/2025 | 31.57 | 35.11 | 31.4 | 34.73 | 7,144,098 | 240,355,318.7 |
| 11/11/2025 | 33.5 | 34.47 | 32.42 | 33.77 | 3,132,703 | 105,196,166.74 |
| 11/12/2025 | 33.5 | 33.5 | 30.03 | 31.395 | 4,408,204 | 138,529,133.16 |
| 11/13/2025 | 30.6 | 30.8 | 26.82 | 27.28 | 5,080,043 | 144,512,491.23 |
| 11/14/2025 | 25.55 | 28.86 | 24.81 | 27.84 | 5,353,884 | 144,440,294.88 |
| 11/17/2025 | 26.765 | 27.85 | 25.81 | 26.93 | 3,586,913 | 96,641,120.89 |
PTIR κΈ°μ κ°μ
νμ¬ κ°μ μ λ³΄κ° μμ΅λλ€.
μ΅μ PTIR κ΄λ ¨ λ΄μ€
κ΄λ ¨ λ΄μ€κ° μμ΅λλ€.
PTIR λ§€μΆ μ 보
ν΄λΉ μ’ λͺ©μ λ§€μΆ μ λ³΄κ° μμ΅λλ€.
PTIR ν¬μμλ³ λ§€λ§€λν₯
μλ§€μλ
κ°μΈ: -
κΈ°κ΄: -
μΈμΈ: -
λμ μλ§€μλ
κ°μΈ: -
κΈ°κ΄: -
μΈμΈ: -
μλ§€μ
| λ μ§ | κ°μΈ | κΈ°κ΄ | μΈμΈ |
|---|---|---|---|
| μλ§€μλ μ λ³΄κ° μμ΅λλ€. | |||
λμ μλ§€μ
| λ μ§ | κ°μΈ | κΈ°κ΄ | μΈμΈ |
|---|---|---|---|
| λμ μλ§€μλ μ λ³΄κ° μμ΅λλ€. | |||
PTIR μμ° λΉμ¨
μμ° λΉμ¨ μ λ³΄κ° μμ΅λλ€.
PTIR λ§€μΆ κ΅¬μ±
λ§€μΆ κ΅¬μ± μ λ³΄κ° μμ΅λλ€.
PTIR 곡맀λ νν©
곡맀λ νν© μ λ³΄κ° μμ΅λλ€.
PTIR μ μ’ λ΄ λΉκ΅
μ μ’ λ΄ λΉκ΅ μ λ³΄κ° μμ΅λλ€.